Hydropower: Difference between revisions

no edit summary
No edit summary
No edit summary
 
(One intermediate revision by the same user not shown)
Line 6: Line 6:


Most hydro power plants that can be built, already have been - [[new hydro|with some exceptions]].
Most hydro power plants that can be built, already have been - [[new hydro|with some exceptions]].
{{considerations}}
==Considerations==
===Geography===
{{sum|Major limiting factor|bad}}
{{empty}}
{{pn|This section should also link to the page on [[new hydro]]power opportunities.}}
===Effects on wildlife===
{{sum|{{rn}} }}
{{empty}}
{{pn|Need to cover both aquatic life (fish etc) and surrounding landscape.}}
===Displacement of people===
{{sum|{{rn}} }}
{{empty}}
{{pn|Need to talk about the 1.4 million people who had to be relocated (homes demolished) in order to build the Three Gorges Dam in China. Is this a common occurrence for hydropower construction?}}


==External links==
==External links==